Skip to content
THE STEADY SPLITFaster miles. Fewer setbacks.

The news desk

Lausanne's Pontaise Stadium Track Rebuilt with New Conica Surface

1 sources · 1 reports

Lausanne's Pontaise Stadium, home of the Athletissima Diamond League meeting, has received a new track surface supplied by Swiss specialist Conica. According to Athletics Weekly, the rebuild cost around CHF 1.5 million ($1.82m) and replaced a track that had lost its World Athletics Class 1 certification. The six-week project installed Conipur Vmax, a surface developed with the German Sport University Cologne, featuring an energy-reflecting base layer with air cells and a stabilizing top layer. Conica has supplied Lausanne's track since the meeting moved to Pontaise in 1986. The work was completed ahead of the 2026 meeting, and the report describes the rebuilt track as keeping Lausanne among the world's fastest Diamond League venues. No other reports on the project were supplied, so cost, timeline, and certification details rest on this single account.

Story reports

Conica's CHF 1.5m Conipur Vmax Rebuild Keeps Lausanne Among World's Fastest Diamond League Tracks

Swiss track specialist Conica rebuilt the Pontaise Stadium surface under Athletissima for around CHF 1.5 million ($1.82m) ahead of the 2026 meeting, replacing a track that had lost its World Athletics Class 1 certification. The six-week project installed Conipur Vmax, developed with the German Sport University Cologne, featuring an energy-reflecting base layer with air cells and a stabilizing top layer. Conica has supplied Lausanne's track since the meeting moved to Pontaise in 1986.

Athletics Weekly